HDPE Modular Pontoon
product Introduction
Chongqing Newmaritime specializes in designing and constructing marinas, floating docks, jetski docks, floating bridges, and other waterfront facilities. With ISO 9001:2000, CE, and TÜV certifications, we use 100% recyclable HDPE materials. Our modular pontoons withstand harsh marine environments, forming stable walkways for sea access and boat docking. Easy to install and dismantle, they save time and labor. Committed to sustainability, we provide long-term reliable service for marine projects.

product Parameter (specification)
Size: Single float: 500*500*400mm, Twin-float : 1000*500*400mm
weight: 7kg±0.3kg (Single Float); 13kg±0.3kg (Twin-Float)
Material: HDPE
Colors: Black,Blue,Grey,Cream,Orange (Customized Color or LOGO AVAILABLE)
Buoyancy: Single float with buoyancy 350kg per squre meter, and double layer can bear 720kg/sqm.
Safety: ANTI-SLIDING surface designing and Strong buoyancy makes the Floating systemsvery safe and stable.
Accessories: Connecting pin,srews and tools, other parts like railing,bollard,anchor&rope,bumper &etc,.
Lifespan: Above 15years depends on different location conditions.
Feature: Floating systems are suitable for any kinds of water area,resistant to UV rays,frost,seawater,corrosion,oil,and apply to the tempreature from -20ºC to 50ºC.
Easy Installation: Floating systems can be easily installed and dismantled.

Floating Dock Installation Process
Step 1: Align the Black Seals
Ensure the black seals of all floating dock sections face the same direction. This standardizes orientation for subsequent assembly.
Step 2: Identify Markings on "Ears"
Locate the number labels (1, 2, 3, 4) marked on the "ears" (protrusions) of each dock section. These guide proper alignment.
Step 3: Stack by Markings
Position the dock sections in a top-to-bottom superimposed manner, matching the numbered "ears" (e.g., ear 1 of the upper section aligns with ear 1 of the lower section).
Step 4: Press the Mushroom Head
Align the mushroom-shaped connector with the socket, then firmly push it downward until fully inserted.
Step 5: Rotate to Lock
Rotate the mushroom head counterclockwise to secure it in place. This locks the sections together stably.
Final Check
Verify all connections: ensure mushroom heads are locked, sections are aligned, and the structure feels stable. The installation is now complete!
More accessories recommend ( fender & handrail):



Production details
Anchoring:
1.If water is less than 3m in depth, steel piles are to be put in proper place and then connected by wheels, which can prevent the floating dock from moving laterally but can automatically rise and fall in line with water level.
2.If water is over 3m in depth, anchoring can be used by sinking the anchorage block pulled by steel cables to the water bottom.

Guarantee:
warranty on our floats are 2 years, that is within two years, if there is any damage caused by the product in normal condition, we will replace the floats for you.
Company workshop:

Pontoon accessories:

Deliver,shipping and serving
Q: What about the delivery time?
A: 5 days for a 20ft container, 7 days for a 40hq container. More quickly for slack season.
Q: What colors are available?
A: Blue, gray, orange, yellow, black, beige could be provided as per customer's requirement.
Q: Can I buy different types in one container?
A: Yes, you can mix different types in one container. Once choosing the items, just ask us for the container capacity.
Q: How do the products packed?
A: Cube bulk packing, accessories pp bags packing
Hot Tags: hdpe modular pontoon, China hdpe modular pontoon manufacturers, suppliers, factory, Marine Cone Type Rubber Fender, marine gangway, Roller Type Chain Stopper, marine chock, Gooseneck Ventilator, danforth anchor
Previous
Marine Floating Jetty PlatformYou Might Also Like
Send Inquiry















